With PCL tackling the on-site construction of the Chinook Power Station, the project needed a fabrication shop to handle fabrication for pipe spools of two inches or fewer in diameter. The job was a low-volume order, which our fabrication facility was nimble enough to fulfill on time, on budget and without a single weld repair.
When the supplied valves and materials arrived in our shop, some arrived without the code-required paperwork. Our team at the fabrication facility assisted in obtaining the documentation to keep fabrication on schedule and without delay.