At Saskatoon International Airport, PCL’s Special Projects division renovated the existing departure hall and replaced the baggage handling system. The upgrades to the departure hall included three new entrances and 28 check-in desks, allowing for a faster check-in experience for passengers. The larger baggage handling system allows a greater volume of bags to pass through and shortens passenger waiting times. Construction continued without disrupting the airport’s day-to-day operations. Passengers can now enjoy a brighter, more spacious hall before their departing flight.
Constructed by