Together these three solar facilities encompass approximately 330 acres and produce over 32 megawatts of energy. The projects were completed in nine months and construction highlights include excavation of the substation area for footings and foundations; construction of the substation and control house; installation of culverts across ditches to the public roadways; and installation of panels, transformers, inverters, and cabling; as well as testing and commissioning.

The project consists of more than 110,000 solar modules that generate direct current (DC) electricity.